Skip to main content
verifiedAIS-156 | UN38.3 | CE | IEC 62619 | 12-market export certification system
EN
TIANQIULi-ion Export
Engineering Library · 15 whitepapers and published datasets3,500 deep cycles, tested80 million km of field operationCalibrated across 12 countries

Behind every quotationis a set of data your engineers can re-check

Selection logic, service life, failure diagnosis, safety validation and the export compliance route are all published here, so procurement decisions rest on traceable engineering data rather than a supplier's assurances. This library is the evidence base behind every TIANQIU quotation, warranty and market-access document.

menu_book
Engineering guides and whitepapers15
battery_charging_full
Deep cycles tested3,500
route
Commercial road-test distance80M km
battery_full
UN38.3 tests passed8 / 8
build_circle
Overseas conversion centres42
timelapse
Retrofit payback period6-8 months

verifiedEvery figure comes from laboratory bench records or overseas field operation; raw curves, test reports and original certification scans are available per project

High-density battery cycle-life testing laboratory
trending_upCapacity retention after deep cyclingSOH > 80.4%
scienceThe Evidence Base

Where this library's data comes from

Bench testing, vibration duty data, standard duty cycles and overseas fleet operation together form the evidence base for this library.

menu_book15Engineering guides and whitepapersCovering selection, electrical, life, safety, export and cost
route80M kmCumulative commercial road testingPassenger and heavy-load duty in 12 key countries
battery_full8 / 8UN38.3 test itemsFull T1-T8 destructive regime passed and archived
build_circle42Overseas conversion centresLive builds in New Delhi, Colombo, Cairo and beyond

Specification notice:The figures above are engineering reference values. They may differ with production batch, configuration and actual duty cycle, and the percentages for life, efficiency, availability and coverage are engineering estimates and bench references. Contact us for the detailed specification sheet.

tuneSelection & Electrical

Selection and electrical matching

Get the voltage platform, real capacity, charger match and BMS communication right first, and the vehicle stops coming back from gradients, fast charging or swap-cabinet commissioning.

shieldLife, Safety & Extreme Climates

Service life, safety and extreme climates

Cycle life, thermal propagation isolation, factory quality control and failure diagnosis in extreme climates decide whether the fleet still runs full shifts in year three.

publicExport, Compliance & Cost

Export, compliance and cost

From dangerous-goods container shipping to three-year total cost of ownership, this last group translates engineering parameters into clearance documents, payback periods and landed unit prices.

helpHow To Use The Library

How to use this engineering library

Reading order, data provenance, requesting raw reports and commissioning a tailored model.

Where should a first-time reader start?expand_more
If you are evaluating procurement, start with Export Pricing and Cost Structure to frame the cost build-up, then use Fleet TCO Economics to model payback. If you are specifying a vehicle, start with 48V / 60V / 72V Voltage Selection and Real Ah Capacity and Range Estimation. If you are already booking an order, go straight to Shipping Compliance and check the document set.
How do we request the full whitepapers and the raw test datasets?expand_more
Submit your vehicle, target market and procurement stage through any enquiry form or the online enquiry page. Our engineering team replies within 24 hours on working days and sends the relevant full PDF whitepaper, raw curve reports and container quotation as required.
Is the data third-party certified or factory-tested?expand_more
Both, and each report states which. UN38.3 and dangerous-goods reports come from CNAS / ILAC accredited third-party test houses. Cycle life, temperature rise and vibration comparison figures are stated with their duty conditions. Duty-cycle distance and energy figures come from overseas fleet operating records. Each conclusion is stated with the basis it rests on.
Can you model our own vehicle, payload and local tariffs?expand_more
Yes. Voltage selection, capacity and range estimation, fleet TCO and container CIF landed cost all have online calculators, so you can trial generic assumptions immediately. For a formal proposal, submit your vehicle duty cycle, daily distance and local fuel and electricity prices and we will issue a multi-currency model and stowage plan.
How do the structures and models in the whitepapers map to the packs on a quotation?expand_more
The voltage platforms, capacity ranges and structural options described in the whitepapers correspond to named stock module series and standard enclosure specifications, and each quotation line states the exact model. Non-standard enclosures, communication protocols or ingress ratings can be built on top of the standard selection with custom stamping and laser marking.
Can the reports be used for tenders, financing or local market access filings?expand_more
Yes. The UN38.3 test summary and MSDS are supplied as bilingual formally stamped documents suitable for destination clearance and tender submissions. For banks and green-transport funds we also provide a third-party-audited Fleet Electrification Feasibility Model — a bank-grade study for clean-transport lending.
request_quoteEngineering Data Request

Request the full engineering data pack and container pricing

Tell us your vehicle, payload duty cycle and target market, and our engineering team will return the matching whitepapers, test curves, destination market-access checklist and container ex-works price schedule within 24 hours on working days.

  • Whitepapers and raw test curves filtered to your vehicle and duty cycle
  • Destination market-access checklist (AIS-156 / SNI / PVoC / SONCAP / GOEIC / CE)
  • Container stowage plan and CIF landed-cost model
callDirect / WhatsApp: +86 13922702227 (English, French and Arabic spoken)
location_onEBattery Office, Room 310I, Huilange BLDG, No. 273, Huangpu Blvd W, Tianhe District, Guangzhou 510620, Guangdong, China
scheduleEngineering data and pricing response within 24 hours on working daysscienceRaw curves and reports available per projectsupport_agentLive engineering session to interpret the data and advise on selection

Specification notice:The figures above are engineering reference values. They may differ with production batch, configuration and actual duty cycle, and the percentages for life, efficiency, availability and coverage are engineering estimates and bench references. Contact us for the detailed specification sheet.

lockProtected by NDA

Vehicle duty cycles and commercial details you submit are used only for this technical study and remain strictly confidential; a mutual NDA can be signed first.