Egyptian TokTok passenger and cargo three-wheelers60V / 72V high-rate LiFePO4 power systems
Built for the 42℃+ dry desert heat and dust of Cairo, Giza and the Nile Delta, and for duty cycles of 18–20 hours a day. With local petrol prices climbing and ageing petrol vehicles breaking down, TIANQIU supplies automotive-grade A-grade heat-tolerant LiFePO4 cells in a non-destructive conversion architecture, fully aligned with Egypt’s mandatory Nafeza / ACID import pre-declaration route.
verifiedHeat-resistant flame-retardant harness and custom charger included · FOB or CIF Alexandria / Port Said · liaison office in 6th of October City, Cairo
Specification notice:Reference values only — batch and duty-cycle variation applies. Contact us for detailed specifications.
Cairo duty-cycle profile
Ambient temperature in old Cairo is 43.5℃ while the BMS ducted temperature rise is only 4.2℃. Every figure below comes from long-term vehicle monitoring in Cairo, the streets of Giza and the hot, dusty Red Sea coast.
Specification notice:The figures above are engineering reference values. They may differ with production batch, configuration and actual duty cycle, and the percentages for life, efficiency, availability and coverage are engineering estimates and bench references. Contact us for the detailed specification sheet.

Field validation: North African desert roads under mixed heavy passenger and cargo duty
No no-load laboratory figures. TIANQIU systems are permanently deployed across Cairo, the alleys of Giza and the hot, dusty Red Sea coast, and have completed tens of thousands of kilometres of extreme heavy-load operation.
- FIELD 01 · Cairo high-temperature heavy-load testing (43℃ heat and dust): continuous round-the-clock operation in old Cairo and around the Giza pyramids. Our ducted intelligent cooling keeps the average daily cell temperature rise at ΔT < 5.8℃ in a 43℃ sandstorm, with BMS active thermal control and zero thermal runaway events.
- FIELD 02 · Heavy climbing and poor road surfaces (1,000kg extreme payload): for the rough gravel tracks along both banks of the Nile and multi-passenger heavy loading, the pack supports 3C transient high-rate discharge. Cells connect through 1.5mm laser-welded pure copper busbars, removing the risk of fusing under hard-acceleration current, with no fade on a continuous 15° climb.
- FIELD 03 · Bajaj / TVS original mounting points, no welding (100% chassis-intact): precision-tooled to the most common Egyptian petrol chassis — Bajaj RE Compact and TVS King. The pack bolts directly to the original lock points, connects through standard aviation connectors, and completes a full vehicle swap in 30 minutes.
- Sandstorm sealing and weather protection: during the annual North African Khamsin sandstorm, conventional packs short out as dust accumulates. TIANQIU uses a thickened cold-rolled steel enclosure with a dedicated labyrinth breather valve and double silicone seals to block fine dust ingress.
Egypt best-selling configurations and container loading matrix
Supports 60V / 72V high-voltage platform switching; heat-resistant flame-retardant harness and custom charger included
| Vehicle and operating scenario | Nominal system specification | Full-charge combined range | Compatible chassis | Peak output current | 20GP container loading |
|---|---|---|---|---|---|
| Classic passenger TokTok All-weather Cairo passenger workhorse | 60V 105Ah (6.3 kWh) | 100 – 120 km | Bajaj Compact / RE | 150A (10s) | 190 units / container |
| Heavy cargo tricycle (Basta) Produce wholesale and construction material haulage | 72V 150Ah (10.8 kWh) | 120 – 140 km (800kg payload) | TVS King / dedicated cargo chassis | 220A (15s) | 140 units / container |
| Premium tourist shuttle tricycle Upscale operation at Giza / Luxor sites | 72V 200Ah (14.4 kWh) | 150 – 180 km (with on-board fan / air conditioning) | Piaggio Ape / European sightseeing vehicles | 260A (10s) | 110 units / container |
| Urban two-wheeler delivery pack Talabat and courier high-frequency swap riders | 60V 30Ah twin parallel packs (3.6 kWh) | 110 – 130 km | Universal two-wheel electric motorcycle | 80A (10s) | 480 units / container |
Container quantities are calculated on standard UN-certified anti-static, shock-isolating wooden pallets, and 40HQ high cubes can carry mixed configurations. Passenger TokToks map to the passenger three-wheeler pack, Basta and tourist shuttles to the heavy-duty cargo tricycle pack, and delivery two-wheelers to the two-wheeler swap pack. FOB / CIF Alexandria / Port Said delivery supported.
Specification notice:The figures above are engineering reference values. They may differ with production batch, configuration and actual duty cycle, and the percentages for life, efficiency, availability and coverage are engineering estimates and bench references. Contact us for the detailed specification sheet.

Heavy cargo and dust protection: the Basta bulk-haulage duty cycle
Egyptian cargo tricycles face gravel surfaces along the Nile and multi-passenger overloads — and once a year, the Khamsin sandstorm. Mechanical strength and sealing have to hold at the same time.
- Heavy cargo tricycle (Basta) configuration: a 72V 150Ah (10.8 kWh) system with 120–140 km typical range at 800kg payload and 220A (15s) peak output, matched to the TVS King and dedicated cargo chassis.
- Premium tourist shuttle tricycle: a 72V 200Ah (14.4 kWh) system measuring 150–180 km with on-board fans or air conditioning running, 260A (10s) peak output, matched to the Piaggio Ape and European sightseeing vehicles.
- Continuous seamless laser TIG-welded enclosure: cold-rolled drawn steel structure with industrial IP65 waterproof, dustproof and flame-retardant Amphenol or aviation connectors, delivering both strength and sealing.
- ePTFE breathable membrane: every micro vent is covered by a waterproof breathable membrane that releases thermal-runaway micro-pressure while blocking desert dust particles down to 2.5 microns.
Egypt Nafeza single-window ACID declaration and dangerous-goods sea freight SOP
Egypt has enforced mandatory tariff pre-declaration since 2021. TIANQIU runs a mature clearance compliance team that keeps North African importers clear of port congestion penalties and return-shipment risk.
- 01receipt_long
Advance declaration in the ACID system
Before loading we help the Egyptian importer register the CargoX number on the Nafeza platform, and complete electronic on-chain filing of the commercial invoice and packing list within 48 hours to obtain the unique ACID number.
CargoX electronic B/L handled end to end - 02dangerous
UN38.3 and Class 9 packing approval
We provide the State Administration for Market Inspection appraisal of dangerous-goods transport packaging (the packing certificate), the MSDS report and the sea transport condition appraisal for the complete pack.
Class 9 dangerous-goods compliant declaration - 03directions_boat
Direct sailing to Alexandria / Port Said
Contracted COSCO and Maersk Mediterranean express services run from Shenzhen Nansha / Shekou direct to the Suez Canal and Alexandria, taking only 14–18 days with no transhipment en route.
Schedule reliability ≥ 96% - 04inventory_2
Bonded spares and local technical liaison
Every container ships with 2% critical consumable spares free (relays, fuse boxes, BMS boards), and our liaison office in 6th of October City, Cairo supports on-site assembly.
In-container spares + remote engineering diagnostics
GOEIC registration, warranty and local service commitments
The General Organization for Export and Import Control (GOEIC) requires pre-shipment conformity verification for imported traction batteries. TIANQIU meets the registration and certification requirements and maintains a local Cairo liaison point.
GOEIC whitelist registration
The TIANQIU manufacturing plant is registered on the GOEIC whitelist. Before shipment, an international third-party inspection body in China (such as SGS or Intertek) issues the pre-shipment Certificate of Conformity (CoC) on our behalf.
3,500+ cycles · 5-year operating warranty
A tropical high-temperature electrolyte blend developed for the Middle East and North Africa, paired with a microporous high-thermal-conductivity separator, full phase-change thermal silicone encapsulation and independent aluminium finned cooling ducts, holds test cycle life at ≥3,500 cycles with over 80% capacity retention even at 45℃.
2% critical consumable spares per container
Every container includes critical consumables free of charge — relays, fuse boxes and BMS boards — with the 6th of October City liaison office in Cairo supporting on-site assembly and remote engineering diagnostics.
March 2026 Egypt container schedule
Container slots for the current schedule are 82% booked. FOB and CIF Alexandria / Port Said delivery are both supported, and earlier confirmation secures earlier production scheduling.
What Egyptian and North African buyers ask us most
How do you work with Egypt’s current foreign exchange controls and letter of credit settlement?expand_more
With Cairo summers at 45℃ dry desert heat, how is pack cycle life protected?expand_more
Do old petrol TokToks need engine and gearbox modifications for conversion?expand_more
How do we complete GOEIC import inspection registration and any duty exemption?expand_more
How is the pack sealed against sandstorm ingress and internal short circuits?expand_more
What is the minimum order quantity, and can we buy samples for on-vehicle road testing?expand_more
Enquire directly with our in-house export division in China
We issue a complete duty-inclusive or CIF Alexandria quotation with a container loading plan within 48 hours, and a factory engineer adds you on WhatsApp within 24 hours on working days to arrange drawings and a sample test plan.
- 100% confirmed L/C at sight supported, with Dubai offshore account coordination if required
- Factory engineer arranging drawing confirmation and sample testing within 4 hours
- Urgent ACID amendment for cargo already in transit to Cairo or Port Said? Documentation and lithium packaging specialists are online now
Specification notice:The figures above are engineering reference values. They may differ with production batch, configuration and actual duty cycle, and the percentages for life, efficiency, availability and coverage are engineering estimates and bench references. Contact us for the detailed specification sheet.
Strictly bound by international commercial NDA. Your container enquiry and sample request are used only for this project.
